Skip to main content
Truong Thinh Corp - Steel Structure Manufacturer

Steel Structure Fabrication and Export FAQ

- Truong Thinh Corp
Container truck loaded with steel structure members at the Truong Thinh Corp factory for export

Direct answers to the questions buyers ask most about steel structure fabrication, pre-engineered buildings, quotations and export shipping from Vietnam. Each answer links to the page with the full detail.

Steel structure sections strapped on a container trailer ready for export from Vietnam
Fabricated steel sections loaded for export shipment from Truong Thinh Corp.

Frequently Asked Questions

What does a steel structure fabricator in Vietnam do?

A fabricator cuts, welds, drills, blasts and coats steel members to your drawings or its own design, then packs and ships them. Truong Thinh Corp does this at its 25,000 m² factory in Ho Chi Minh City. Read more: steel structure fabricator in Vietnam.

What is the production capacity of Truong Thinh Corp?

Truong Thinh Corp fabricates 1,200–1,500 tons of steel per month, equal to 14,400–18,000 tons per year, at one steel structure factory in Ho Chi Minh City. Current company data is kept on the Company Facts page.

What certifications does Truong Thinh Corp hold?

Truong Thinh Corp has a quality system certified to ISO 9001:2015, and its welding quality is certified to EN ISO 3834-2:2021 by Bureau Veritas, valid until 16 September 2029. See certified quality.

What is included in a pre-engineered steel building?

A PEB includes primary frames, secondary framing (purlins and girts), bracing, roof and wall cladding, and connections. They are designed and fabricated as one system. Read more: pre-engineered steel building manufacturer in Vietnam.

What is the difference between PEB and a conventional steel building?

A PEB uses built-up sections tapered to the bending moment and suits repeated frames such as factories and warehouses. A conventional frame uses rolled sections and suits heavy cranes or irregular geometry. See PEB vs conventional steel building.

What information is needed to design a steel warehouse?

Floor area, clear span, eave height, floor and roof loads, doors and docks, ventilation and fire requirements, and the site or destination port. Read more: steel structure for warehouse.

How is an industrial steel building different from a warehouse?

An industrial building is designed around the production process: crane loads, equipment supports, heavier floors and ventilation. A warehouse is designed mainly for clear span and racking. See industrial steel building.

What are the main components of a steel structure?

Columns, rafters or beams and trusses form the primary framing. Purlins, girts and bracing form the secondary framing. Connections and cladding complete the building. See steel structure components.

How long does steel structure fabrication take?

Design and detailing usually take 2–4 weeks and fabrication 4–8 weeks, depending on volume. Erection adds 6–12 weeks for medium-scale projects, and most projects finish within 3–6 months from design approval. See steel structure lead time.

What affects the cost of a steel structure?

Tonnage, span, design loads, crane and equipment loads, coating system, packing, transport and schedule all change the price. A quotation is itemised and based on your drawings. Read: steel structure cost guide.

What information is needed for a quotation, and how fast is the reply?

Send drawings or the building use, plan area, span, eave height, loads, destination port and target date. Truong Thinh Corp replies within 24 working hours of a complete enquiry. Use the quotation form or read the RFQ guide.

Which countries does Truong Thinh Corp ship steel structures to?

Truong Thinh Corp ships from Ho Chi Minh City to Southeast Asia and Australia. Route guides: Malaysia, the Philippines, Singapore and Australia.

How are steel structures packed for export?

Members are marked and bundled for container or break-bulk shipment, with packing lists that match the erection drawings. The method depends on member size and the destination port and is confirmed in the quotation. See the route guides above.

Does Truong Thinh Corp handle erection?

Erection scope is agreed per project. Truong Thinh Corp supplies erection drawings and technical support, and a local contractor can assemble to them. Any supervision on site is stated in the quotation. Ask through the quotation form.

Free quotation · Reply within 24 working hours

Request a quotation for steel structure faq

Sourcing steel structures from Vietnam? Send your drawings or tonnage, destination and target schedule, and we will return an itemised export quotation, usually within 24 working hours.

Need an answer faster? Call our engineers directly.

Mon–Fri 8:00–17:30 · Sat 8:00–12:00 (GMT+7)

Call now: +84 935 657 568
No drawings yet? Choose "No drawings yet" and send the request anyway. Our engineers will advise first.
PDF, DWG, DXF, ZIP, Excel, Word or images. Up to 5 files, 15 MB each.

Truong Thinh Corp - Author at Truong Thinh Corp
Truong Thinh Corp