Defects Liability in Steel Structure Contracts: What to Define

- Truong Thinh Corp

Defects liability in steel structure contracts is the period after handover when the contractor must fix defects at its own cost. It is not the same as a general warranty, and the wording matters. Define which defects are covered, for how long, how they are reported and what is excluded, before the contract is signed.

What defects liability means

A defects liability period starts at handover or practical completion. During it, the contractor returns to correct faults that arise from poor materials, workmanship or design in its scope. A related idea is a warranty, though contracts often treat the two differently, so read each clause.

Choosing the period

The period depends on the contract and the market. Define separate periods where parts differ: for example, structural steel may be covered for longer than coatings or accessories. Say when each period starts and what restarts it, such as a repair.

Defects liability in steel structure contracts relies on records: quality inspection documents checked beside racks of steel members
Quality inspection documents checked beside racks of steel members

What to define for defects liability in steel structure contracts

  • Covered defects. Fabrication errors, welding defects, wrong materials, coating failure that arises from poor preparation, and erection faults in the contractor's scope.
  • Exclusions. Damage from misuse, overloading, changes made by others, lack of maintenance, accidents and force majeure.
  • Reporting. How the owner notifies a defect and how quickly the contractor must respond.
  • Remedy. Repair or replace, at whose cost, and who pays for access, such as cranes or scaffolding.
  • Evidence. Which records decide whether a defect is covered.

Records that settle disputes

Most disputes turn on records. Keep the shop drawings, the mill certificates, the welding and inspection records and the coating reports. Our guides to mill test certificates and to steel factory quality control describe the documents. Photographs of the delivered condition, such as those taken in a pre-shipment inspection, also help.

Maintenance duties of the owner

Many exclusions depend on maintenance. A coating needs inspection and touch-up; a roof needs clear gutters. Write the owner's maintenance duties into the handover documents, and keep a log. Our guide to maintaining steel structures lists the checks.

Scope and responsibility

The party responsible for a defect depends on who did the work. If one steel structure contractor carries design, fabrication and erection, responsibility is simple. If scopes are split, define the interfaces. Our article on what a steel structure contractor provides explains the usual splits.

Responsibility for design versus fabrication

If the contractor also designs the structure, a design fault is the contractor's to fix. If the owner's engineer designs and the contractor only fabricates and erects, a fault in the design is not the contractor's liability, but a fault in making the steel to the drawings is. State this split in the contract so that a defect claim starts from a clear division of duty.

Questions before signing

  1. What is the period for each part of the work, and when does it start?
  2. How are defects reported, and what is the response time?
  3. Which records decide a claim?
  4. What is excluded, and what does the owner have to maintain?
  5. Is there any security or retention linked to the period?

Contract terms differ by country and by project, so have a lawyer review the final wording. This article is general information and not legal advice.

If you would like to discuss the warranty and defects terms for a project, contact the engineering team and send the draft contract.

Frequently Asked Questions

Is a defects liability period the same as a warranty?

Not always. A defects liability period is often a contractual repair obligation after handover, while a warranty may be a separate promise on a product. Read each clause.

Who pays for access, such as a crane, to repair a defect?

The contract should say. Many contracts make the contractor pay when the defect is in its scope.

Does a repair restart the period?

Only if the contract says so. Define whether repaired parts get a new period.

Free quotation · Reply within 24 working hours

Send your project details to our engineering team

Tell us about your steel structure project. Our engineering and sales team will reply with a tailored proposal, usually within 24 working hours.

Need an answer faster? Call our engineers directly.

Mon–Fri 8:00–17:30 · Sat 8:00–12:00 (GMT+7)

Call now: +84 935 657 568
No drawings yet? Choose "No drawings yet" and send the request anyway. Our engineers will advise first.
PDF, DWG, DXF, ZIP, Excel, Word or images. Up to 5 files, 15 MB each.

Truong Thinh Corp - Author at Truong Thinh Corp
Truong Thinh Corp

Truong Thinh Corp – Steel Structure Services

We design, manufacture, supply and erect pre-engineered steel structures for factories, warehouses and industrial projects across Southeast Asia.

Request a Free Quotation