In the construction industry, weather is always one of the biggest challenges, directly affecting project schedules and quality. At Truong Thinh Construction & Trading Investment JSC, this is not only seen as a risk but also as an opportunity to demonstrate organizational capability, proactiveness, and responsibility towards partners and clients.

1. Flexible and practical construction planning

From the preparation stage, Truong Thinh incorporates weather factors into both overall and detailed schedules. Based on meteorological data and local experience, construction timelines are adjusted proactively—accelerating outdoor work during favorable weather and mobilizing resources to recover progress as soon as conditions allow.

Additionally, 2–3 backup scenarios are always prepared to cope with situations such as prolonged rain, storms, or extreme heat.

2. Application of modern technology and equipment

Investments in advanced construction equipment—capable of operating in light rain or on difficult terrain—help minimize downtime. A digitalized project management system is also applied to monitor progress, allocate manpower and materials efficiently, and reduce time loss.

How Truong Thinh ensures project progress during adverse weather conditions

3. Timely workforce and material backup

We always maintain contingency plans for overtime labor and essential materials to respond quickly to unexpected weather changes. Construction teams work in shifts, with the flexibility to increase working hours when schedules need to be accelerated. Unlike many contractors that rely heavily on third parties, Truong Thinh operates its own factories and warehouses, ensuring proactive material reserves during rainy seasons or periods with limited transportation.

4. Ensuring workplace safety under all conditions

While deadlines are critical, Truong Thinh prioritizes worker safety above all. In adverse weather such as heavy rain, strong winds, or extreme heat, risk assessments are conducted, and work is temporarily suspended to safeguard workers’ health and lives. When construction resumes, all activities are reviewed to ensure technical and safety compliance.

5. Transparent communication with stakeholders

We maintain open and regular communication with project owners, providing progress reports, explaining any delays (if applicable), and outlining corrective measures. This transparency fosters trust and partnership, especially in force majeure events such as storms or floods.

With nearly 20 years of experience in the construction and mechanical engineering industry, Truong Thinh has built a reputation for responsibility and reliability. We consistently deliver projects on time and as committed, even under unfavorable weather conditions. This is achieved through proactive strategies, modern technology, and the expertise of our construction team.