Level 1 water canal system and operating roads on both sides of the canal of Tay Ninh PMU oil and gas irrigation system.

Truong Thinh Construction Investment and Trading Joint Stock Company participated in the construction of 05 packages. The work volume includes concreting the earthen canal system and renovating and renewing the operating road along the canal bank. Red gravel road of the first-class canal in Duong Minh Chau district. Road along the first-class canal bank before constructing the road surface structure.

The first-class water channel system and the operating road on both sides of the canal of the Tay Ninh PMU irrigation system.

 

Location Ho Dau Tieng - Tay Ninh
Scale 05 packages
Category Construction
Time 2014